Return to Loup Power District Home Page

Main PageProject DescriptionLicensing ProcessFrequently Asked QuestionsPublic & Agency ResourcesDocumentsRelated LinksContact Us  

Second Initial Study Report

All files are PDFs. If you need Adobe Reader, click here to download for free.

Main Document File Size
Transmittal Letter, Cover, Table of Contents & Document 1.2MB
   
Appendices - Study Reports  
Appendix A Sedimentation Study Report Addendum Revised 03/08/11 5.3MB
  Sedimentation Study Report (First Initial Study Report) 5.5MB
Appendix B Hydrocycling Study Report Revised 03/08/11 7.4MB
Appendix C Water Temperature in the Loup River Bypass Reach Study Report 8MB
Appendix D Flow Depletion/Flow Diversion Study Report 3.3MB
Appendix E Fish Passage Study Report (First Initial Study Report) 2.9MB
Appendix F Recreation Use Study Report 6.8MB
  Creel Survey Revised 03/08/11 1.2MB
Appendix G Land Use inventory Study Report (First Initial Study Report) 7.8MB
Appendix H Section 106 Compliance Study Report 61kb
Appendix I Ice Jam Flooding on the Loup River Study Report
Revised 03/08/11
1.9MB
Attachments to Appendix A, Appendix B, Appendix C, Appendix D and Appendix F available by calling (402) 399-1341

Second Initial Study Results Meeting Summary

 

 

 

 

    Last updated February 14, 2011 - Copyright